AV Documentation & Show Operations

The documentation layer of AV work, tech packs, preproduction checklists, gear lists, handoff packages, and the habits that keep shows and installs repeatable.

The documentation *is* the professionalism

Two crews can carry identical gear. The one with a tech pack, diagram, gear list, cable schedule, IP schedule, contact sheet, loads in faster, troubleshoots faster, and looks like the safer hire, because it is. Documentation isn't overhead on the work; for clients who can't watch you solder, it's the visible part of the work.

Build the habit around two documents: the preproduction checklist that front-loads every question a venue or client will eventually force you to answer, and the tech pack that packages the answers for the crew. Everything else, as-builts, handoffs, change logs, is a variation on keeping those two current.

  • If it isn't written down, it's tribal knowledge, and tribal knowledge doesn't scale past the person holding it.
  • Version documents like code: proposed → issued → as-built, with dates.
  • Hand-off means the next tech succeeds without calling you. That's the test.

Guides in this topic

  • The AV Preproduction Checklist, The complete AV preproduction checklist, booking, site survey, system design, crew, week-before prep, and show day. Every item open on the page, no email wall.
  • How to Create an AV Tech Pack, What goes in an event AV tech pack, the assembly order that keeps every document consistent, and the hand-off test that proves your pack is crew-ready.

Export a full tech pack from WireFlow

Diagram, gear list, cable schedule, and rack views in one crew-ready PDF packet, generated from a single project.

Start your tech pack free · See a sample tech pack