Best practices for clean diagrams

Layout, naming, and review habits that keep diagrams readable for crew and clients.

When to use this

Review before sending a diagram to a client or printing for the road case.

Layout

  • Flow left-to-right or top-to-bottom — cameras → switcher → distribution → displays.
  • Keep power and network paths visually separate from SDI/HDMI when possible.
  • Align devices to a grid; avoid diagonal spaghetti across the canvas.

Naming

  • Match intercom call signs and rack tape labels.
  • Include model numbers in notes, not necessarily in the visible device title.
  • Version the project name or export filename when sending rev 2 to venue.

Review checklist

  • Every device in the gear list appears on the diagram (or is intentionally omitted with a note).
  • Backup paths labeled (A/B switch, redundant encoder).
  • IP addresses and VLAN notes captured on network gear.
  • No orphan ports that crew will ask about on site.

Presentation

Use locked devices and consistent header colors for client-facing exports.

Hide debug notes before share links go to venue staff.