Best practices for clean diagrams
Layout, naming, and review habits that keep diagrams readable for crew and clients.
When to use this
Review before sending a diagram to a client or printing for the road case.
Layout
- Flow left-to-right or top-to-bottom — cameras → switcher → distribution → displays.
- Keep power and network paths visually separate from SDI/HDMI when possible.
- Align devices to a grid; avoid diagonal spaghetti across the canvas.
Naming
- Match intercom call signs and rack tape labels.
- Include model numbers in notes, not necessarily in the visible device title.
- Version the project name or export filename when sending rev 2 to venue.
Review checklist
- Every device in the gear list appears on the diagram (or is intentionally omitted with a note).
- Backup paths labeled (A/B switch, redundant encoder).
- IP addresses and VLAN notes captured on network gear.
- No orphan ports that crew will ask about on site.
Presentation
Use locked devices and consistent header colors for client-facing exports.
Hide debug notes before share links go to venue staff.