Reducing setup mistakes
Checklist habits that catch mis-patches before power-on.
When to use this
Run through before first power-on on site or bench.
Pre-power checklist
- Compare physical patch to wiring plan row by row for critical paths (PGM, REF, audio master).
- Verify network paths — VLAN, static IP, switch port — against diagram notes.
- Confirm LED data chain direction matches wiring plan origin.
- Check redundant paths — backup switcher, B encoder — actually wired, not just drawn.
Process
- Two-person rule: one patches, one reads plan aloud.
- Photo as-built rack and attach to project notes post-show for next tour leg.