Preparing documentation before show day
Timeline and deliverables for freezing docs and distributing to crew and venue.
When to use this
Use when building a prep schedule for a medium or large production.
Recommended timeline
- T-2 weeks — draft diagram and wall/rack layouts from quote
- T-1 week — port-level connections complete; internal review
- T-3 days — wiring plan export; share link to department heads
- T-1 day — freeze rev; print rack pages and critical path schedules
- Load-in — as-built notes only for changes; re-share if rev bumps
Deliverable bundle
- View-only share links (diagram + rack + wall as applicable)
- PDF tech pack for offline venue (weak cell service)
- Cable label export for shop prep
- Contact line for doc owner (TD cell or lead engineer)