Preparing documentation before show day

Timeline and deliverables for freezing docs and distributing to crew and venue.

When to use this

Use when building a prep schedule for a medium or large production.

Recommended timeline

  • T-2 weeks — draft diagram and wall/rack layouts from quote
  • T-1 week — port-level connections complete; internal review
  • T-3 days — wiring plan export; share link to department heads
  • T-1 day — freeze rev; print rack pages and critical path schedules
  • Load-in — as-built notes only for changes; re-share if rev bumps

Deliverable bundle

  • View-only share links (diagram + rack + wall as applicable)
  • PDF tech pack for offline venue (weak cell service)
  • Cable label export for shop prep
  • Contact line for doc owner (TD cell or lead engineer)